You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Exhibition centre Bilbao

Datos de Proyecto

Ubicación: Bilbao, España

103 m high reception, congress and administrative building

Construction period: until 2005

Requerimientos

  • unusual construction method for the generation of the slabs from top to bottom, suspended on a hat structure
  • strict safety regulations

Cliente

UTE EACO (ACS, OHL, FONORTE, MORKAITZ Y CYCASA)

Beneficios para el cliente

  • efficient production method
  • reduced cycle times
  • adherence to strictest safety requirements
Exhibition Centre Bilbao Statement - Juan Gallego, Construction Manager
Juan Gallego
Construction Manager

PERI offered us a very efficient production process, reduced cycle times and the adherence to strict safety regulations for this very tall edifice.

Solución PERI

  • ACS self-climbing scaffolding for 98 m high elevator shaft core
  • project-specifically adjusted shoring and formwork solutions for the shuttering of nine storeys from top to bottom